Nevada Sunrise holds a 20.01% interest in the Kinsley Mountain joint venture, with New Placer Dome, as operator, holding a 79.99% interest.
The 2020 Kinsley Mountain RC and diamond drill campaign was completed in November 2020 and comprised 49 drill holes totaling 17,970 metres , with 3 holes abandoned and re-drilled from the same locations.
Gold values returning greater than 0.1 g/t Au are also subject to leach analysis where the sample is treated with a 0.25% NaCN solution and rolled for an hour.
Nevada Sunrise is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data referred to herein.
Mr. Allender has examined the information provided by New Placer Dome, which includes his review of the sampling, analytical and test data and procedures underlying the information and opinions contained herein.
1 Technical Report and updated estimate of mineral resources on the Kinsley Project, Elko County, Nevada, U.S.A., effective January 15, 2020 and prepared by Michael M.
Nevada Sunrise owns 100% interests in the Jackson Wash and Gemini lithium projects, both of which are located in Esmeralda County.
Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur and include disclosure of anticipated exploration activities.
Such factors include, among others, risks related to the interpretation and actual results of historical production at Kinsley Mountain, reliance on technical information provided by third parties on any of our exploration properties, including access to historical information on the Kinsley Mountain property as well as specific historical data associated with drill results from the property, information from New Placer Dome Gold Corp., current exploration and development activities; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; failure of New Placer Dome Gold Corp.
Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.
The securities of Nevada Sunrise Gold Corporation have not been registered under the United States Securities Act of 1933, as amended, and may not be offered or sold within the United States or to the account or benefit of any U.S.