When complete, the viaduct will carry HS2 trains between London, Birmingham, and the North at speeds of up to 360km/h.
In a major step forward for viaduct design in the UK, the team opted for two wide box-girder beams per span instead of eight smaller beams to simplify and speed up assembly.
“Working alongside our design partners, we have tackled the carbon challenge from two angles.