“A bright, clean modern facility, nice and clean and fresh,” he says.
It allows the facility to bring an entire 150-car grain train onto the property and load it in continuous motion as it moves around the track.
Loop tracks are by far the simplest and most efficient way to load longer trains, and they’re easily the best way to unload them.