Kelowna, British Columbia– is pleased to report assay results from 4,516m drilled in 17 diamond drill holes completed along the McLymont Fault during the 2020 exploration program at Newmont Lake.
Cole Evans, President/CEO of Enduro Metals commented, “Despite initial setbacks, 2020 was a transformative year for Enduro Metals, putting the Company in a great position heading into the 2021 exploration season.
We know where we need to go, what we need to do, and we have the money to do it.
The AuEq formula used for calculations is: AuEq g/t = True widths are unknown as the mineralized body remains open and requires further drilling.
Core samples from the Newmont Lake Project were sent to MSA LABS’ preparation facility in Terrace, B.C., where samples were prepared using method PRP-910.
The technical information in this news release has been reviewed and approved by Mr. Maurizio Napoli, P.
Building on prior results, the Company’s geological team have outlined 4 deposit environments of interest across the Newmont Lake Project including high-grade epithermal/skarn gold along the McLymont Fault, copper-gold alkalic porphyry mineralization at Burgundy, high-grade epithermal/skarn silver/zinc at Cuba, and a large 9km x 4km geochemical anomaly hosting various gold, silver, copper, zinc, nickel, cobalt, and lead mineralization along the newly discovered Chachi Corridor.
Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause Enduro’s actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements.
Forward-looking statements in this document includes statements, but is not limited to results, analyses and interpretations of exploration and drilling programs; our grassroots exploration program, our mining , expansion, exploration and development activities, geological and mineralization interpretations and the plans, results, costs, and timing thereof.
This list is not exhaustive of the factors that may affect any of our forward-looking information.
The forward-looking information contained in this news release represents the expectations of the company as of the date of this news release and, accordingly, is subject to change after such date.
Information included in this media release have been prepared in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects and information contained herein may not be comparable to similar information disclosed by U.S.