Arizona Gold Drills 49 g/t Gold and Provides Drilling Update

Giulio Bonifacio, CEO of Arizona Gold, stated: “We are pleased to announce additional drill results from the current underground core drilling program, which continues to demonstrate continuity and extension of several mineralized domains as previously defined.

Reverse circulation in-fill drilling of the stopes is expected to commence in May with close-spaced drilling which will provide detailed information for purposes of stope mining design.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Michael R.

Quality Assurance and Quality Control StatementProcedures have been implemented to assure Quality Assurance Quality Control of drill hole assaying being done at an ISO Accredited assay laboratory.

About Arizona Gold Corp.Arizona Gold is an emerging American gold producer advancing the restart of production at its 100-per-cent-owned, fully permitted, past-producing Copperstone mine project, located in mining-friendly Arizona.

These uncertainties and risks include, but are not limited to: the strength of the Canadian economy; the price of gold; operational, funding, and liquidity risks; reliance on third parties, exploration risk, failure to upgrade resources, the degree to which mineral resource and reserve estimates are reflective of actual mineral resources and reserves; the degree to which factors which would make a mineral deposit commercially viable are present, and the risks and hazards associated with underground operations and other risks involved in the mineral exploration and development industry.

…Read the full story