Great Bear Reports Successful LP Fault Extension and Infill Drilling: 10.50 g/t Gold Over 13.10 m …

VANCOUVER, BC, April 22, 2021 /CNW/ – Great Bear Resources Ltd.

Chris Taylor, President and CEO of Great Bear said, “Predictability is a trait that builds first-class mineral deposits, distinguishing the ‘best of the best’.

Average grades are calculated with un-capped gold assays, as insufficient drilling has been completed to determine capping levels for higher grade gold intercepts.

Great Bear’s progress can be followed using the Company’s plan maps, long sections and cross sections, and through the VRIFY model posted at the Company’s web site at www.greatbearresources.ca.

The Dixie Project is 100% owned, comprised of 9,140 hectares of contiguous claims that extend over 22 kilometres, and is located approximately 25 kilometres southeast of the town of Red Lake, Ontario.

Great Bear is focused in the prolific Red Lake gold district in northwest Ontario, where the company controls over 330 km2 of highly prospective tenure across 5 projects: the flagship Dixie Project all of which are accessible year-round through existing roads.

Core samples from the program are cut in half, using a diamond cutting saw, and are sent to Activation Laboratories in Ontario, an accredited mineral analysis laboratory, for analysis.

Mr. R.

Forward-looking statements and information can generally be identified by the use of forward-looking terminology such as “may”, “will”, “should”, “expect”, “intend”, “estimate”, “anticipate”, “believe”, “continue”, “plans” or similar terminology.

Great Bear undertakes no obligation to update forward-looking information except as required by applicable law.

…Read the full story